Home > Quality>Mold Construction Control


MOLD CONSTRUCTION CONTROL


At Winstill, the hardness of all incoming steel will be 100% inspected and validated. All cavity and core steel, inserts, electrodes will be carefully inspected by our QC team in CMM room. We will never allow any NG parts pass to the next stage.





 

Copyright(C) Winstill Mold Industrial Limited. All Rights Reserved.